What does your waste actually cost?

Set your own figures against the running cost of an on-site incinerator. An indicative estimate — it compares operating costs, not the cost of ownership.

The waste

kg per month

What leaves the property today, before any processing.

USD per kg

All-in: labour, transfer and Wamco charges.

Running the machine

USD per litre

Delivered price on the island, not the Malé pump price.

USD per month

The operator’s time, once the machine is in service.

Before and after

CostNowWith incineratorSaving
Monthly$3,500$1,545$1,955
Annual$42,000$18,540$23,460

Total saving over

Time horizon in years

$70,380

What this assumes

Fuel burned per kg of waste
0.015 L
Fuel used at this volume
150 L per month
Daily load to size a machine against
333 kg per day

Indicative estimate only

These figures compare running costs, not the cost of ownership. They exclude the machine, installation, maintenance and spares, and the disposal of residual ash. A payback period needs all four, and needs your site — that is what a site assessment is for.

Bring these numbers to a site assessment

Every installation includes

  • Installation, testing and commissioning
  • Operator training and warranty
  • AMC, spare parts and after-sales technical support