Incineration systems, specified for island properties
GreenWave supplies and installs Addfield UK incinerator systems for controlled waste-volume reduction, including diesel-fired, dual-chamber systems suitable for resort and island waste management applications.
- British designed. British built.
- World leaders in incineration technology.
- Unrivalled build quality and machine longevity.
- Distributed to more than 150 countries.
- Environmentally responsible.
- Trusted partner, over 40 years’ experience.
The Addfield range
Five incinerator series, from a 750 kg batch machine to a continuous stepped-hearth plant. Capacity is the first thing to settle on an island property — everything else follows from it.
- Series
- 5
- Manufacturer
- Addfield
- Smallest load
- 750 kg
- Largest load
- 2,000 kg

Addfield SB
750 kg per batchThe smallest of the batch-loading dual-chamber machines, taking 750 kg in a single load. Suited to a property whose daily waste fits one burn.

Addfield TB
1,300 kg per batchThe mid-range batch machine at 1,300 kg a load, and the series most often specified for a full resort operation.

Addfield TB-AB
2,000 kg per batchThe largest batch machine in the range at 2,000 kg a load, for properties or island facilities taking waste from more than one site.

Addfield MP300
300–450 kg per dayBuilt for clinical and hazardous waste rather than general refuse — the machine a hospital or an island clinic specifies, running to 450 kg over an eight-hour cycle.

Addfield G250
250 kg/hourA continuous stepped-hearth machine rather than a batch loader: it runs at 250 kg an hour, which is the scale an island council handles rather than a single property.
Installed at 7 properties

Waldorf Astoria Maldives Ithaafushi
Ithaafushi Island, South Malé Atoll
Awarded a complete turnkey waste-incineration project covering consultancy, equipment supply, civil works and site preparation, fuel-system and pump connections, installation, testing and commissioning, operator training, warranty, and ongoing after-sales technical support.

JW Marriott Maldives Resort & Spa
Vagaru Island, Shaviyani Atoll
Delivered a complete smoke-free waste incineration solution, including consultancy, equipment supply, installation, testing and commissioning, operator training, warranty coverage, and after-sales technical support.

Amari Raaya Maldives
Raa Atoll
Delivered a turnkey waste management solution, including consultancy, civil works, equipment supply, installation, commissioning, operator training, warranty support, and long-term technical assistance.

Dhigali Maldives
Dhigali Island, Raa Atoll
Delivered a complete Smoke-Free waste incineration solution, including consultancy, supply, installation, commissioning, operator training, warranty, and after-sales support.

Alila Kothaifaru Maldives
Raa Atoll
Delivered a turnkey waste management solution, including consultancy, civil works, equipment supply, installation, commissioning, operator training, warranty support, and long-term technical assistance.

Cora Cora Maldives
Raa Atoll
Delivered a complete waste-incineration solution covering consultancy, equipment supply, installation, testing and commissioning, operator training, warranty, and after-sales technical support.

Nika Island Resort & Spa
North Ari Atoll
Delivered a complete Smoke-Free waste incineration solution, including consultancy, supply, installation, commissioning, operator training, warranty, and after-sales support.
Case study · Addfield · 2021–22
Environmentally sustainable incineration in the Maldives
Addfield’s own account of putting SB and TB incinerators onto Maldivian resort islands. It is worth reading for the conditions rather than the sales copy: resort waste arrives mixed rather than as the single stream these machines are usually specified against, so the commissioning visit in February 2022 was spent tuning the burn for that mix — and on an island where smoke or odour reaches the guests, that tuning is the difference between a working plant and a complaint.
Read the case study- SB series
- 750 kg/day
- TB series
- 1,300 kg/day
- Waste stream
- Mixed organic and inorganic
- Commissioned
- February 2022, on site
Addfield credit their regional agent Hydro Global, which shares ownership with GreenWave, for the installations described. GreenWave’s own installations are listed above and in the project register.
Welcome to Addfield
The manufacturer’s introduction to their incineration range, published on their own channel.
Published by Addfield Environmental Systems Ltd. Plays from YouTube on request.
Not sure which model fits your property?
Every installation includes
- Installation, testing and commissioning
- Operator training and warranty
- AMC, spare parts and after-sales technical support

